Get your free epoxy floor quote
The Provider (Epoxy CDMX) agrees to install the epoxy coating at the client's location according to the specifications previously agreed upon. The Provider will use high-quality materials and all supplies necessary to complete the project.
The duration of the epoxy project depends at all times on the square footage, style, design, and location. For reference, a 400-square-foot garage has an estimated time of one working day plus a minimum of 24 hours for the epoxy coating to dry properly. This time may vary due to unforeseen circumstances, for example, bad weather, road traffic, a mechanical problem, etc.
The installation process will depend on the style and design of the epoxy coating. Each style and design has a different process and may vary depending on the surface to be covered (concrete, wood, tile, etc.). If the area to be covered with epoxy is covered with carpet, laminate flooring, tile, or vinyl tile, it will be removed and properly disposed of. (Attention: this has an extra cost.)
The process for each epoxy coating always includes grinding the concrete whenever it is uncovered/exposed and not covered by carpet, rugs, laminate flooring, tile, or vinyl tile. The process also includes repairing holes and cracks, cleaning the entire area to remove dust before applying the epoxy coating, and installing a primer-type base coat for each design or style, as applicable.
SERVICE HOURS
Maryland
Hours
Monday - Friday
8am - 6pm
Contacts
epoxycdmxllc@gmail.com
